« Christmas 2007 | Main | Tulia in December 2007 »
December 30, 2007
Remodel
The floors were installed, and now they have been stained. 2 coats of clear coat are on and a final one will be put on after the subs finish their work.
The fireplace got a travertine tile treatment. Also the shower was tiled in the master bath.
The outside posts are getting there treatments as well.
Posted by mku at December 30, 2007 09:52 AM